The SCHEDULED Feed, sometimes referred to as a BIOCIDE Feed, drives the output (relay) on a scheduled day or days of the week for the user defined duration (expressed in MINUTES). The feed will begin at the defined "Start Time". The SCHEDULED Feed runs on 28 day calendar. The SCHEDULED Feed offers a "Schedule Frequency" option, this option provides the ability to repeat the schedule on weekly intervals (Every week, Every other week, and Every third week).
To configure the Scheduled Feed:
Enable -
Slide the Toggle to GREEN, this will enable the output
Description -
User provided Name for the output. This will be displayed in the user
interface
Start Time - Time is entered in 24 hour format (hh:mm) for example entering the start time as 09:00 is 9:00 a.m. Entering the start time as 15:00 is 3:00pm. The Start Time represents the time of day the relay will turn on
Duration - Enter the amount of time for the relay to run. This value is entered in MINUTES
Day(s) of Week - From the drop down menu select the day or days of week that the relay will run. This drop down menu offers multi-select
Schedule Frequency - From the drop down menu select the frequency at which the schedule will repeat. Options are: Every Week, Every other week, Every Third week.
Digital
Lockout - From the drop down select digital outputs that
will be locked out (not able to run) while the relay you are
configuring is running
Analog
Lockouts - From the drop down select analog outputs
that will be locked out (not able to run) while the relay you are configuring is running
Additional Lockout After Feed - This option allows you to lockout relays for a defined period AFTER the completion of the scheduled feed. Duration of time is expressed in Minutes
Pre-Blowdown - This option allows for a blowdown PRIOR to the scheduled feed beginning.
Blow Down Output - from the drop down select the bleed or blow down output
Input - from the drop down select the input that is used for the blow down (typically conductivity)
Setpoint - enter the target setpoint you wish to meet prior to the scheduled feed starting
Duration - this is the amount of time the pre-blowdown may run in the event the pre-blowdown setpoint is not reached.